- Moisture barrier construction and Landfill physical/geological assessment;
- Landfill cell liner and capping construction third party construction quality assurance/supervision (TPCQA/CQA), including Geotechnical Inspection and Testing Authority (GITA) if required for earthworks;
- Seepage and ground water quality monitoring;
- Waste water retention structures and water treatment lagoons;
- Remediation of contaminated land for development and construction on former landfill sites;
- Phase 1 and Phase 2 preliminary environmental site assessments with reference to AS4482 Guide to sampling and investigation of potentially contaminated soil and classification of sites based on the National Environmental Protection Measures (NEPM) and the proposed future use of the site;
- Assessment of soil waste in accordance with Industrial Waste Resource Guidelines (Vic EPA) IWRG621 and classification as Fill material, Category A, Category B and Category C contaminated soil and how to effectively dispose or remediate the soil waste;
- Drainage and erosion rehabilitation including Water sensitive Urban Design (WSUD), site assessment and soil capability, erosion control/management/rehabilitation treatments;
- Drafting and implementing environmental management plans (EMP) in accordance with EPA publication 480, environmental risk assessment as per HB203 and HB145, QA auditing and EMP compliance as per ISO 14000.